I decided to tackle the side windows. I found some PVC conduit that fits inside the larger conduit I made the round ports from that sit at the side of the bridge. I cut rings of the smaller conduit by parting them off on the mini lathe. These rings were then stuck to small pieces of 2mm acrylic sheet (perspex). The acrylic was then carefully sanded flush with the rings and then pushed into the existing larger conduit tube window being careful not to push them all the way through into the cockpit where I would never be able to get them out again.
Next I tackled the crew door, knocking up a design in 2D CAD. This was printed out fullsize onto paper which was cut out and stuck to two layers of 1.5mm styrene temporarily stuck together to make Two doors.
I then went to town on detailing the remaining surfaces with many flat panel kit parts, 0.5 styrene panels, evergreen tiles, half circle profile piping and general nurnies.
This was done section by section laying out the largest flat panel parts first and then filling in the gaps with 0.5 styrene and nurnies, rather like doing a jigsaw and getting all the pieces to fit.
This brings the construction phase of this project to a conclusion, although the bare bits of PVC pipe, just before the nozzles may need some further attention. I will know for sure when the rest of the surfaces get sprayed with primer which is the next step.
Thanks for looking.
More soon...